Current Bids
Updated 2010-03-03 07:53:46
Bid documents for all projects are posted in our construction office at www.isqft.com, where they may be viewed and/or downloaded free of charge. To obtain access, request an invitation to bid from Greg Paff (gpaff@reececampbell.com). Hard copies may be viewed at Reece-Campbell’s Office and also may be purchased / viewed as noted below.
Bids should be faxed to (513)542-4629 or e-mailed to GNX@reececampbell.com
Kroger Store J929
Within-the-Walls Renovation
281 E Pettit
Fort Wayne, IN 46806
Bid Due Date: March 3, 2010 @ 2:00pm
Addendum 1 (02/26/10): Issued various drawing and scope clarifications in 8-1/2 x 11 format. Issued Pre-Bid Meeting Agenda, which is part of the Addendum, and to be considered in pricing. NO Drawings were issued or re-issued as part of this addendum.
Notes: Primarily Within-the-Walls Remodel and 1,040sf Addition of existing 66,566sf Kroger Store. Limited Exterior Work including Asphalt Repair & Restripe and Exterior Painting is described on Sheet G0.1 (Cover Sheet)
Refrigeration & Fixturing-related MEP work, Low Voltage Systems (Kroger Pre-Qualified Vendors ONLY) and Decor Installation are a part of this bid.
Fixture removal/relocation/setting is by Kroger.
Work will be phased, and store WILL REMAIN OPEN throughout Construction.
Work is scheduled to begin 3/15 and complete 7/31.
Plans are available from Phipps Repro(513)793-1030 and may be seen at
Reece-Campbell’s office and Dodge Planrooms.
G E Aviation: Building 701 Demolition Putback
1 Neumann Way
Cincinnati, OH 45215
Bid Due Date: March 3, 2010 @ 2:00pm
Q & A Log: Contains RFI questions and responses (26 items).
Addendum 2: Added alternate for light poles/fixtures. Revised and reissued 15 plan sheets (all plans except C2, S1 & E2); added sheet S7. Major changes to new entrance.
Addendum 3: Provided information regarding waste disposal. Provided geotechnical borings and report.
Notes: Construction of New Front End/Entrance to Building 700 after demolition of building 701 (Completed by others)
Work also includes new Sidewalks, Landscaping & Stairwell
On-Site Workforce to be 100% Union
All subcontractors must have an EMR Rating <1, and have a clean safety record.
Proposals must show Labor/Material Cost Breakdown. Wage rate forms must be filled in and provided with bids.
Plans are available from Phipps Repro(513)793-1030 and may be seen at Reece-Campbell
RCI Contact: Dan Redman (513)542-4600 / dredman@reececampbell.com
Kroger Store L753
Expansion/Renovation
1265 Goss Ave
Louisville, KY 40217
Bid Due Date: March 3, 2010 @ 2:00pm
Addendum 1 (02/26/10): Issued 19 revised plan sheets (most due to swapping the Loss Prevention and ECR Rooms) - See writeup for further info. Reissued the entire specification book, updating many sections and eliminating some. Also see the writeup for RFI responses (2 items) regarding exterior brick selections
Addendum 2 (03/01/10): Issued color version of Fixture Plan to clarify existing versus new. Issued pre-bid meeting sign-in sheet. No further clarifications are included.
Notes: Approx. 20,000sf expansion of existing Kroger store to 67,456sf; including renovations to existing area, and related (limited) sitework. Also includes demolition of approx. 10,000sf adjacent Retail Space.
Refrigeration & Fixturing work will be included in this contract.
This project is scheduled for 210 days; Store Will Remain Open Throughout
Plans are available from Phipps Repro(513)793-1030 or Lynn Imaging(502)499-8400
Plans may be viewed at RCI or at Dodge or Builders Exchange Plan Rooms.
Ross Middle & Elda Elementary Schools (Additions/Renovations)
3425 & 3980 Hamilton-Cleves Rd
Hamilton, OH 45013
REVISED Bid Due Date: March 4, 2010 @ 2:00pm
Addendum 1 (02/22/10): 164 page addendum primarily in 8-1/2x11 format. Issued missing Finish Schedule for Elda Elementary. Included new bid form. Note: Bids must now be separated BY SCHOOL for accounting purposes.
Addendum 2 (02/26/10): 73 page addendum in 8-1/2x11 format. Extended bid date.
Notes: Minor additions and major renovations to Ross Middle School & Elda Elementary School, including related sitework.
Reece-Campbell will be bidding the General Trades Packages Only
This project is SALES TAX EXEMPT; This is NOT a prevailing wage project.
The project is designed to achieve LEED Silver Status
There are 2 Alternates for Ross Middle School -
Alt 1 is a 2-classroom addition (~1900sf)
Alt 2 is a separate 4-classroom addition (~3700sf)
The Project is scheduled to Start March, 2010 & Complete by 08/01/11
Plans are available from Lynn Imaging(513)454-1040 or Phipps Repro(513)793-1030
and may be seen at at Reece-Campbell's office or at Dodge (Cinti & Dayton), Builders Exchange (Cinti, Dayton & Louisville), ACI (Cinti) or Reed (Online) Planrooms
New Huber Heights Elementary School #5 (Valley Forge)
7191 Troy Manor Rd
Huber Heights, OH 45424
Bid Due Date: March 17, 2010 @ 12:00pm
Notes: New 77,845sf 2-Story Elementary School, with related sitework and demolition of existing building.
Reece-Campbell will be bidding the General Trades Package Only
A pre-bid meeting was held on 3/4/10 @ 1:00pm at the Huber Heights School District Admin Offices (5954 Longford Rd)
This project is SALES TAX EXEMPT; This is NOT a prevailing wage project.
The project is designed to achieve LEED Silver Status
There is 1 General Trades Alternate, for Limestone Lintels & Sills.
A breakout price is requested for building demolition, including grading & seeding of that area.
The Project is scheduled to Start 04/29/10 with Building Occupation by 08/01/11 and final completion by 10/01/11.
Plans are available from Lynn Imaging(513)454-1040 or Phipps Repro(513)793-1030
and may be seen at at Reece-Campbell's office or at Dodge (Cinti & Dayton), Builders Exchange (Cinti, Dayton & Louisville), ACI (Cinti) or Reed (Online) Planrooms
New Huber Heights Elementary School #4 (Standpipe)
8895 Emerald Gate Dr
Huber Heights, OH 45424
REVISED Bid Due Date: April 7, 2010 @ 12:00pm
Addendum 1 (02/04/10): Extended bid date. No further notes.
Notes: New 75,835sf 1-Story Elementary School, with limited sitework.
Reece-Campbell will be bidding the General Trades Package Only
Majority of grading & utility work is completed under Early Site Package contract; this contract includes remaining grading & utilities, and site finish
A pre-bid meeting was held on 1/28 @ 10:00am at the Huber Heights School District Admin Offices (5954 Longford Rd)
This project is SALES TAX EXEMPT; This is NOT a prevailing wage project.
The project is designed to achieve LEED Silver Status
There is 1 General Trades Alternate, for Limestone Lintels & Sills
The Project is scheduled to Start 03/25/10 & Complete by 08/01/11 (will be revised)
Plans are available from Lynn Imaging(513)454-1040 or Phipps Repro(513)793-1030
and may be seen at at Reece-Campbell's office or at Dodge (Cinti & Dayton), Builders Exchange (Cinti, Dayton & Louisville), ACI (Cinti) or Reed (Online) Planrooms
|